estimations
英 [ˌɛstɪˈmeɪʃənz]
美 [ˌɛstəˈmeɪʃənz]
n. 判断; 评价; 看法; (对水平、数量等的)估计
estimation的复数
柯林斯词典
- N-SING 评价;看法;判断
Yourestimationof a person or situation is the opinion or impression that you have formed about them.- He has gone down considerably in my estimation.
我对他的评价已经一落千丈。 - ...Lee Dixon, the best player on the pitch in his manager's estimation.
教练心目中球场上最好的球员李·狄克逊
- He has gone down considerably in my estimation.
- N-COUNT 估算;估价
Anestimationis an approximate calculation of a quantity or value.- In fact, the first group were absolutely correct in their estimation of this man's height.
事实上,第一组人对这名男子身高的估计完全正确。 - ...estimations of pre-tax profits of £2.25 million.
估计税前利润达225万英镑
- In fact, the first group were absolutely correct in their estimation of this man's height.
双语例句
- Thus, with UCPM user acceptance or systems integration, teams will be able generate more accurate estimations much earlier than the other test phases.
因此,有了UCPM用户的验证或者系统的整合,团队就能够生成更精确的比其它测试阶段更早的评估。 - This reduction in uncertainty also reduces the variance in estimations, since there is a direct correlation between these factors and the ability to produce sound estimates.
这种不确定性的削减还减少了估计中的变化,因为在这些因素和生成可靠估值的能力之间存在直接的关联。 - Prepare detailed written reports that estimate property values, costs, outline methods by which the estimations were made, and meet appraisal standards.
准备详细的书面报告,估计属性值,成本,概述的方法,估算了,并满足评价标准。 - Estimations of error for interpolation neural networks in distance spaces
距离空间中插值神经网络的误差估计 - In this paper, estimations of varying-coefficient models with the correlated random errors are given by the local linear method. Furthermore, its asymptotical formalities are discussed.
在误差相关的情况下,使用局部线性方法给出变系数模型的估计,并讨论估计的渐近正态性。 - Some Notes on Convergence Rates for Error Variance Estimations in Linear Models
关于线性模型中误差方差估计的收敛速度的若干注记 - Annotate the problem query with relevant statistics to better understand what the DB2 optimizer is using for its estimations.
使用相关统计数据来注释有问题的查询,这样可以更好地理解DB2使用哪些内容来进行评估。 - Parameter Estimations of Multi-Dimensional Correlation Coefficient Stationary Series Based on MCMC
基于MCMC的多维相关系数平稳序列 - In particular, the team can estimate the three values lowest, nominal, and highest estimations assuming that the risk was removed, and then apply these values to reestimate the project variance.
特别地,团队可以估计三个值最低、标准和最高估计值交涉去掉了风险,并且应用这些值重新估计项目方差。 - The obvious question becomes: Why are software engineers so incapable of accurate estimations?
问题来了:为什么无法对软件工程进行精确的评估呢?
