词语屋>英语词典>demolition翻译和用法

demolition

英 [ˌdeməˈlɪʃn]

美 [ˌdeməˈlɪʃn]

n.  (建筑物的)摧毁,拆毁,拆除

复数:demolitions 

TOEFLGREIELTS经济

BNC.7696 / COCA.10854

柯林斯词典

  • N-VAR (建筑物的)摧毁,拆毁,拆除
    Thedemolitionof a building is the act of deliberately destroying it, often in order to build something else in its place.
    1. The project required the total demolition of the old bridge...
      该项目要求将老桥完全拆毁。
    2. The High Court has granted permission for the demolition work to continue.
      高等法院批准拆除工作继续进行。
  • N-UNCOUNT (体育运动等中的)大败,击溃
    Thedemolitionof a team or opponent is their defeat by a great amount.
    1. ...Lazio's impressive 3-1 demolition of Inter Milan.
      拉齐奥队以 3 比 1 大比分击败国际米兰队

英英释义

noun

  • the act of demolishing
    1. an event (or the result of an event) that completely destroys something
        Synonym:destructionwipeout

      双语例句

      • Demolition work is already underway on the site.
        工地上的拆毁工作已经在进行。
      • That they were doing some demolition work for a hydroelectric project.
        他们要对水电站进行拆除工作。
      • The robots can carry out tasks such as rubble clearance, demolition and radiation testing.
        机器人可以进行碎石的清除,爆破和辐射的检测。
      • Spillover damage from the building's demolition was confined to some broken glass.
        拆除这座大楼带来的损失仅仅是一些玻璃被震碎了。
      • The Commission on Chicago Landmarks refused to grant the building landmark status, clearing the way for its demolition.
        芝加哥地标委员会拒绝授予这栋大楼地标地位,并为其拆除扫清了道路。
      • The High Court has granted permission for the demolition work to continue.
        高等法院批准拆除工作继续进行。
      • Many years ago, a co-worker and I were sent to do some demolition as part of remodeling project.
        多年以前,一个同事和我被派去做一些拆除工作,这些是作为改造项目的一部分的。
      • This paper introduced the blasting demolition of a strip-shaped base.
        介绍了建筑物条形基础的爆破拆除。
      • The post-blasting investigation of the effect of blasting indicated that the demolition blasting of the cofferdam was successful.
        爆破效果调查表明,此次围堰拆除爆破是成功的。
      • The demolition of the chimneys shall be carried out only after these recommended mitigation measures have been fully implemented.
        拆卸烟囱的工程必须在这些建议缓解措施全部实施后才可进行。